Cogeneration is a technology for the simultaneous production of heat and electricity in one plant.
It makes it possible to increase the efficiency of the power system by up to 90%, reduce costs and increase the energy independence of facilities.
It is especially relevant in the context of rising energy prices and unstable supplies.
Where cogeneration units are used
.webp)
Industrial enterprises
It allows to significantly reduce the cost of electricity and heat supply, especially in round-the-clock production.

Housing and communal services (HCS)
It provides autonomous heat supply and electricity for residential areas, boiler houses, and heating stations.

Business centers and commercial facilities
Energy independence, backup capacity and savings for shopping and office complexes.
Stages of implementation of a cogeneration unit
Audit and design
01
Study of the facility, analysis of needs, calculation of capacity and economic feasibility.
Supply of equipment and installation
02
We supply certified equipment from trusted manufacturers and carry out installation in compliance with all regulations.
Commissioning and maintenance
03
We carry out startup, setup and take the plant for maintenance.
Advantages of cogeneration
Reducing electricity and heat costs
Savings of up to 40-60% compared to separate production.
Energy independence and reserve capacity
Energy independence and backup capacityA reliable source of energy in the event of grid outages.
Environmental efficiency
Reduced CO₂ emissions and more efficient fuel use.
The cost of installing a cogeneration system
The price depends on the power, fuel type, operating and installation conditions. On average, the payback period is from 2 to 3 years. Sargon offers flexible solutions and accurate calculations for each facility.
Why choose Sargon
We work with CC2 and CC3 objects
Full cycle of work - from design to commissioning
Direct deliveries of equipment with a guarantee
Implementation experience in Kharkiv and the region
Completed projects
Check out our portfolio
Photo
Address
Type of work

KS “Starosaltivskyi Lyceum”
Apartment building

KZ “Starosaltivskyi Lyceum”

CHP-3 – Reconstruction of HVO at the “CHP-3” branch of KP “KHTM”

Hotel “Kremenets”

Reconstruction of heating networks
Apartment building
Results in numbers
2021 — 2025
( 25+ )
completed projects in Ukraine
&
( 27 )
professionals on the team
&
( 2 )
licenses
СС2 & СС3